Skip to main content

Walden Power

Walden Power (formally Walden North Hydroelectric Project) is a 16 MW run-of-river hydroelectric facility situated on Cayoosh Creek about five kilometres west of Lillooet, British Columbia, near the confluence of Cayoosh Creek and the Seton River.

The plant diverts creek flow through a 250-metre power tunnel and 100-metre penstock to five Litostroj horizontal Francis turbines, generating an average of approximately 33.8 GWh of electricity per year, all of which is sold to BC Hydro.

Commissioned in 1992 on private land, the facility was acquired by Innergex Renewable Energy in 2016 in partnership with Cayoose Creek Development Corp. It remains one of the longer-operating run-of-river projects in the region.


Nearby points of interest

Find excellent fishing spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.

Water and weather conditions (10 day forecast)

Check the forecast at Walden Power before you go fishing.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top fishing waters

No waters available right now.

Smarter Fishing Starts in the App.

onWater Fish gives you everything you need to plan smarter, fish better, and own every trip from first cast to last.