Skip to main content
Black Friday: 50% off onWater Pro and onWater+ for your first year. Get the deal 

Violin Lake Dam

Violin Lake Dam was built in 1918 across Goodeve Creek, the natural outlet of Violin Lake, located roughly seven kilometres south of Trail, British Columbia.

The dam created a reservoir approximately 1,660 metres long and 25 hectares in size, and together with the Cambridge Creek Reservoir formed a critical municipal water supply system until 1994, when the City of Trail transitioned to the Columbia River as its primary source.

Although no longer operational, the dam required ongoing monitoring and management. In December 2019, the BC Dam Safety Officer ordered the City to either upgrade the spillway or pursue decommissioning. Removal was chosen as the most feasible option.

The south portion of the dam was removed in August 2021 as part of a $2.14-million ecosystem and flood mitigation project, with the floodplain of Goodeve Creek restored to a naturally functioning stream.

The area has since been closed to recreational use, as access requires crossing private property.


Nearby points of interest

Find excellent fishing spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.

Water and weather conditions (10 day forecast)

Check the forecast at Violin Lake Dam before you go fishing.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top fishing waters

No waters available right now.

Smarter Fishing Starts in the App.

onWater Fish gives you everything you need to plan smarter, fish better, and own every trip from first cast to last.