Pingston Hydro

Pingston Hydro is a run-of-river hydroelectric facility situated on Pingston Creek, a tributary of the Columbia River near Revelstoke, British Columbia.

The plant generates 45 MW of capacity and produces approximately 170,000 MWh of electricity per year, delivering power to BC Hydro via a 66-kilometre transmission line.

The project's defining engineering feature is an exceptional vertical drop of 590 metres, making it one of the highest head run-of-river plants in Canada.

Water is diverted from Pingston Creek through a 3.6-kilometre tunnel and a 0.6-kilometre steel penstock down to a powerhouse on the shore of Upper Arrow Lake, where three horizontal Pelton turbines generate electricity.

Construction required a 450-metre raised bore drilled through hard mountain rock.

Environmental considerations were incorporated into the project design, including installation of rock reefs to enhance fish habitat within the headpond, logjam structures upstream, and a dedicated fish spawning channel downstream.

The plant began operations in 2003.


Nearby points of interest

Find excellent fishing spots, easy access to boat ramps, and all the amenities you need for a memorable day. Your adventure starts here.

Water and weather conditions (10 day forecast)

Check the forecast at Pingston Hydro before you go fishing.

No forecast data available.

Bc licenses and regulations

No licenses or regulations available for Bc.

Explore Canada waters

Top fishing waters

No waters available right now.

Smarter Fishing Starts in the App.

onWater Fish gives you everything you need to plan smarter, fish better, and own every trip from first cast to last.